Skip to main content

Overview

factory.online + BEEDIGIT– Integrated Smart Manufacturing

Updated over 5 months ago

Welcome to the Future of Manufacturing

factory.online and BEEDIGIT are more than just software platforms – they represent a revolution in how modern factories operate. Built to empower manufacturers of all sizes, these two seamlessly integrated solutions cover the entire production journey:

From customer order – to machine – to delivery.

Whether you’re producing high-precision machines, smart devices, or kilometers of specialized cable, our system enables you to plan, execute, and optimize with confidence.

One Ecosystem. Two Powerful Tools.

factory.online

factory.online is your command center for planning, coordination, and control. It replaces disconnected spreadsheets and outdated ERPs with a cloud-based platform built for real manufacturing.

Key features include:

  • Sales & Order Management

  • Supply Chain Planning (purchasing, safety stock, lead times)

  • Master Production Scheduling (MPS)

  • Capacity Planning & Job Scheduling

  • Inventory Control & Demand Forecasting

  • Standard & Actual Costing

BEEDIGIT

BEEDIGITis your window into the real-time shopfloor. It connects machines, sensors, and operators directly to the digital world, making invisible problems visible.

Key features include:

  • Real-Time OEE (Overall Equipment Effectiveness)

  • Cycle Time & Downtime Tracking

  • Machine-to-System Feedback

  • Operator Terminals (Tablets, Scanners, Label Printers)

  • Batch & Quality Traceability

Together, factory.online and BEEDIGITprovide a closed-loop manufacturing system – where plans become actions, and real-time data improves every future decision.

Why It Matters

Today's factories face increasing pressure to:

  • Deliver faster

  • Reduce costs

  • Maintain traceability

  • Meet fluctuating demand

Our platform was designed to solve exactly these problems:

  • ✅ No more Excel chaos

  • ✅ No more disconnected ERPs

  • ✅ No more paper on the shopfloor

Instead, you get a system that thinks ahead, executes with precision, and learns from reality.

Real Results

Our clients report:

  • ↑ Up to 20% increase in machine output

  • ↑ Up to 30% reduction in unplanned downtime

  • ↓ Up to 30% decrease in inventory holding costs

  • ↑ Up to 99% on-time delivery

Built for All Manufacturing Types

  • Discrete Manufacturing: Machines, equipment, smart devices, metal, wood

  • Process & Batch Manufacturing: Plastics, food, chemicals

  • Cable & Wire Manufacturing: Specialized support for cutting, marking, changeovers

Whether you're a fast-scaling startup or a regional leader, our system grows with you.

Did this answer your question?