Skip to main content

Scaling with factory.online: Subscription Tiers That Grow with You

Scalable cloud MES & MRP for manufacturers. Start simple, scale to smart factory with IIoT and advanced planning.

Updated over 6 months ago

Whether you’re a small manufacturer just getting started or a multi-factory enterprise looking to optimize global operations, factory.online provides a smooth and scalable path to digital transformation. Our modular platform adapts to your current needs—and grows with you as your operations expand.

Start Small, Stay in Control

Our entry-level plans (Free and Starter) are ideal for teams that want to move away from spreadsheets and get their sales and inventory processes under control.

  • Track orders, manage customers, and release job orders — all in one place.

  • Keep inventory accurate with basic stock management and traceability.

  • Begin planning production with routing and material requirements tools.

Perfect for teams piloting digital manufacturing with 1 user and a limited number of items or SKUs.

Unlock Full MRP and Scheduling Capabilities

As your operations mature, the Standard and Pro tiers introduce advanced production planning and procurement functionality.

  • Labor and capacity planning to anticipate bottlenecks

  • Forecast-driven material planning with safety stock logic

  • Output confirmations and costing to track what really happens on the floor

  • Job order scheduling with Gantt views and changeovers

You’ll also gain access to multi-location support, PowerBI integration, and deeper MES execution capabilities.

Enable Smart Factory Scenarios

For growing teams managing multiple production lines, client segments, or international markets, Advanced and Enterprise editions offer the full power of factory.online:

  • Advanced scheduling with scenario-based planning and job grouping

  • Sales & Operations Planning (S&OP) and dependent demand forecasting

  • Actual costing with BEEDIGITdata from machine feedback

  • Multi-level BOMs, routing by location, changeover matrices

  • Full master data configuration and digital twins

  • Unlimited item and user scalability

You’ll also get early access to new features, API integrations, and dedicated key account management.

Seamless Upgrade Path

All subscriptions follow a modular architecture—you never pay for what you don’t need.

  • Add users, items, and locations when your business requires it.

  • Unlock new functional modules (like MES, costing, or multi-factory support) without reimplementation.

  • Preserve your existing data, setup, and dashboards as you upgrade tiers.

BEEDIGIT Integration at Every Stage

Even on early plans, you can start capturing shopfloor data through BEEDIGIT. As you scale to higher tiers, real-time OEE, job tracking, and costing insights from BEEDIGIT integrate directly into:

  • Job Order execution

  • Actual vs. standard cost tracking

  • Machine-level performance dashboards

Secure, Cloud-Native and Flexible

Each subscription tier benefits from:

  • Role-based access controls

  • Secure multi-tenant infrastructure

  • Knowledge base and AI-powered assistant

  • Live and priority support on higher tiers

Start Small. Scale Confidently.

With factory.online, you’re never locked in. Begin with just 1 user and 40 items, and grow to unlimited users, full-blown MRP, and real-time IIoT-driven manufacturing—at your own pace.

Ready to scale? Let your software grow with you.

Did this answer your question?