Skip to main content

System Architecture and Modular Design

Modular MES & IIoT platform built for scalable manufacturing. factory.online + BEEDIGIT adapt to your factory, from planning to execution, with cloud-native, API-ready architecture.

Updated over 5 months ago

Designed for Flexibility, Built for Growth

factory.online and BEEDIGIT are architected with one core principle: manufacturers should not have to adapt to software – the software should adapt to the factory.

Our modular and layered architecture gives you:

  • A flexible entry point (start small)

  • Room to grow (scale as needed)

  • Seamless integration with your machines, systems, and teams

Modular Architecture Explained

Our solution is divided into clearly defined functional modules, grouped into two core layers:

Planning & Management Layer (factory.online)

  • Sales & Quotation Management

  • Product Data Management (BOMs & Routings)

  • Master Data (Customers, Work Centers, Items)

  • Material Requirements Planning (MRP)

  • Capacity & Resource Planning (CRP)

  • Job Order Scheduling (APS)

  • Procurement & Inventory Management

  • Costing & Analytics

Execution & Monitoring Layer (BEEDIGIT)

  • Shopfloor Job Order Execution

  • Machine Data Acquisition (IIoT)

  • Operator Terminals & Instructions

  • OEE & Cycle Time Tracking

  • Batch & Traceability Logging

How the Layers Communicate

Planning decisions made in factory.online (e.g. job orders, materials, priorities) are transmitted directly to operators and machines via Beedigit.

Execution data (cycle time, actual quantities, downtime) is returned in real time to update planning, costing, and performance dashboards.

This creates a closed feedback loop, enabling rapid adjustments and continuous improvement.

Deployment: Cloud-Native and Scalable

  • Cloud-hosted: No on-premise infrastructure needed

  • Browser-based UI: Runs on any modern device

  • Modular Pricing: Start with core modules, expand as needed

  • API-ready: Easily integrate with your existing ERP, accounting, CAD, or analytics tools

Built on Industry Standards

  • APS, MRP, CRP principles

  • ISA-95 & MES architecture

  • IIoT-ready (MQTT, HTTPS, OPC-UA optional)

Example Deployment Paths

Stage

Modules Enabled

Suitable For

1. Starter

Sales, Inventory, POs

Small teams or pilots

2. Planner

Add MRP, Routing, Scheduling

Growing manufacturers

3. Integrator

Add MES + Beedigit

Full shopfloor connectivity

4. Optimizer

Add costing, multi-site, analytics

Multi-factory deployments

Summary

Our architecture gives you the power to:

  • Start simple

  • Scale with confidence

  • Integrate everything

  • See the truth on your shopfloor

Whether you’re building machines, cables, or rockets – you deserve a smart factory backbone that works for you, not against you.

Did this answer your question?