Job Order Scheduling with Constraints

Visual production scheduling with factory.online. Use Gantt charts to align jobs, machines, labor, and constraints for on-time, efficient manufacturing execution.

Updated over 4 months ago

From Plan to Execution Timeline

Planning is strategy. Scheduling is reality.

Once job orders are generated, factory.online helps you sequence them in the most effective way, respecting all constraints of your shopfloor:

  • Capacity

  • Dependencies

  • Setup time

  • Transportation between stations

  • Labor availability

Gantt-Based Scheduler

Our interactive scheduler gives you a visual timeline across:

  • Work centers (machines or stations)

  • Job sequences

  • Color-coded status indicators

Drag & drop jobs, lock sequences, or simulate alternatives.

What Constraints Are Considered?

Routing Dependencies

  • Final assembly can’t start before subassemblies finish

  • Parallel tasks run on available machines

Changeover Time

  • Setup durations between products

  • Automatically calculated from product characteristics (e.g. cable grade, color, wire size)

Transportation Time

  • Time needed to move WIP between stations or halls

  • Especially important for large items or multi-floor operations

Work Center Availability

  • Real shift calendars (including breaks and maintenance)

  • Multiple lines or machine alternatives

Labor Qualifications

  • Match operators to tasks by skill

  • Resolve constraints when specific grades are required

Advanced Features

  • Highlight late jobs or capacity conflicts

  • Export Gantt for customer commitments

  • Manual override with reason logging

Benefits

  • Visual clarity over workload and conflicts

  • Shorter changeovers = higher throughput

  • Deliver more with the same machines

Scheduling is not just putting jobs on a calendar – it’s aligning resources, constraints, and priorities to deliver on time, every time.