Skip to main content

Actual Costing with BEEDIGIT Integration

Track true production costs with factory.online and BEEDIGIT. Capture real-time material and labor data to analyze cost variances, fix inefficiencies, and improve profitability.

Updated over 6 months ago

Your Shopfloor, Measured in Euros (or Dollars)

factory.online and BEEDIGIT together unlock actual costing at a level most ERPs can only dream of. With real-time feedback from machines and operators, you can calculate:

  • What each batch really cost

  • Which operations overran

  • Where losses occurred

How It Works

Actual Material Costing

  • Track real prices from purchase invoices

  • Allocate batch-specific cost if prices differ

Actual Execution Time

Collected automatically from:

  • Machine cycle time via BEEDIGITsensor

  • Operator terminal inputs for manual/assembly jobs

Per-Batch Calculation

Every job order has:

  • Planned vs actual time

  • Planned vs actual material

  • Variance in cost

Deviation Analysis

  • Highlight where standard cost diverged

  • Spot slow processes, wrong assumptions, or poor batches

Benefits

  • Fix hidden inefficiencies

  • Get accurate product-level profitability

  • Make data-driven decisions about pricing, process, and purchasing

Actual costing turns the factory into a mirror. It reflects your true performance.

Did this answer your question?