Multi-Level BOM and Digital Twin Structure of Your Products

Manage deep, multi-level BOMs with factory.online. Link assemblies to routing, simulate costs, and power accurate planning, costing, and production with a true digital product twin.

Updated over 6 months ago

Build the Product Once. Use It Everywhere.

Your Bill of Materials (BOM) is not just a spreadsheet — it’s your digital twin of the product.

factory.online supports deep, multi-level BOMs with complete integration into planning, costing, and production.

Key Features

Unlimited Assembly Levels

  • Works with shallow or complex structures (50+ levels tested)

  • Subassemblies can be reused across products

Visual BOM Navigation

  • Collapse/expand levels

  • View by part, routing, or operation

Routing Integration

  • Each BOM level tied to specific operations

  • Define work center, cycle time, setup time per step

Batch Requirements Propagation

  • For regulated goods (e.g. cables), batch ID and marking rules flow through the BOM levels

What-If Costing and Simulation

  • Check impact of component changes

  • See cost ripple effects instantly

Benefits

  • Maintain clean, scalable product data

  • Enable MRP, APS, and costing to function accurately

  • Support product customization and reuse

The BOM is your foundation. We make it solid.