Skip to main content

Configurable Product Management

Manage product variants and configurations with ease. factory.online lets you build flexible BOMs, auto-generate item codes, and handle complex customizations without duplication.

Updated over 6 months ago

From Variants to Configurations: Master the Complexity

If your products have multiple options, features, or regional adaptations, managing them in a traditional ERP quickly becomes a nightmare.

factory.online supports configurable product models, so you can define once and sell infinitely — without duplicating your data or BOMs.

Who Needs This?

  • Machinery manufacturers with custom modules (e.g. camera, GPS, battery)

  • Cable factories producing region-specific standards

  • Any company with optional features, finishes, or specs

How It Works

Item Classes & Product Groups

  • Define the "type" of product: e.g. Drone, Cable, Machine

  • Each class includes relevant characteristics

Configurable Characteristics

  • Example: Camera = [Standard, Night, Thermal]

  • Example: Battery = [4S, 6S]

  • Example: GPS = [Yes, No]

Matrix BOMs

  • One BOM includes all possible parts

  • Constraints define when to include which item
    e.g. If Battery = 6S → use Battery_6S component

Automatic Code Generation

  • System builds unique item codes and names for each combination

  • No need to manually create every variant

Benefits

  • Zero duplication of BOMs

  • Clear structure for complex products

  • Sales and engineering stay aligned

From 10 variants to 10,000 combinations — we make it manageable.

Did this answer your question?