Skip to main content

Inventory Management and Batch Traceability

Real-time inventory tracking by batch, location, and quality status. factory.online ensures traceability, accurate valuation, and full control across warehouses.

Updated over 6 months ago

Know What You Have. And Where It Is.

Inventory is more than a number – it’s your ability to fulfill orders.

factory.online provides real-time inventory visibility across:

  • Locations

  • Warehouses

  • Batches

  • Quality status

Key Inventory Features

Batch-Level Stock Tracking

  • Track every lot received, produced, or consumed

  • Support for expiry dates and batch aging

  • See history of each batch: when received, used, or scrapped

Location Management

  • Multi-warehouse, multi-zone tracking

  • View stock by aisle, shelf, or machine buffer

Quality Status Control

  • Accept / Reject / On Hold / Expired

  • Visual indicators on inventory lists

  • Prevent use of blocked material in production

Real-Time Valuation

  • Inventory amounts tied to material costing

  • FIFO / LIFO / weighted average supported

Benefits

  • Eliminate stockouts and overstock

  • Ensure traceability in regulated industries

  • Minimize waste from expired or misplaced goods

What’s in stock should never be a mystery.

Did this answer your question?